Skip to content

MORE PIERS

  • by
  • piers

With framing and electrical work in Container 1 completed (as of summer 2022), there are several options for next steps.  Insulation is a possibility. We’ll be using spray foam, and… Read More »MORE PIERS

THE SUBFLOOR

It won’t be until much later that we decide what kind of floor we’ll have in the house—maybe something cool like epoxy or concrete—so for now, before we began framing,… Read More »THE SUBFLOOR

RUST REMOVAL

Once the container was welded in place we went right at the rust. Although our container was classified as “wind and water tight” when we bought it, it had dents… Read More »RUST REMOVAL